Further to the article on tacking below. The person is using and old set of train bogies with metal wheels which of course will lead to tracking - The following could help.
If you look closely the blue chain links are finely engineered with a ridge that runs on the undersurface of the roadbed. Ensure your magnets are pushed in flush within the links cavity for the magnets. Any proud edge will rub on the surface. You should always have the roadbed perfectly flush with the top of the channeling so there is major lifting the chain as this may also precipitate the chain lifting out completely and jamming. The underside of your road bed is just as important so make sure you give it enough protective coats of paint as hard continuous use will wear away the surface covering both sides. Th only other option with your wheel hack is to get something like duct tape and cut a fine strip and wrapped it around the wheels so that it is not the metal running on the road surface rather the duct tape insulating it which should not track on your paint so easily. Hope this helps - Clyde
2 Comments
Clyde Humphries
18/1/2024 06:27:03 pm
Yes, as long as the covering of the baseboard is secured over the chain it will function.
Reply
Leave a Reply. |
AuthorClyde has been involved for many years with the Magnorail system having initially built his own layout "Echo Lakes" featuring two concepts using the Magnorail System. In 2019 he rebirthed his layout as Crater Lake featuring four Magnorail circuits plus an Ho3 train line around the perimeter which is now the Magnorail flagship for exhibitions. Archives
May 2022
Categories |